Crown Herron 2

Project Details

The Crown Herron 2 Project involved the installation of 858 helical piles, each measuring 3.5 inches in outer diameter (OD) and 10 feet in length. These helicals were strategically placed to ensure optimal load-bearing capacity and structural stability.

As part of the project, our team meticulously installed caps on each helical pile, providing a secure foundation for the next phases of construction. This installation process required precision, expertise, and adherence to industry standards to guarantee long-term performance and durability.

Through careful planning and execution, we successfully completed the project, ensuring a reliable foundation for the Crown Herron 2 site.